Excellent condition.$28Kĭredges: 4” Proline. Two 4” Berkeley pumps,20 hp 3 phase,Īlso VS 4” trash/transfer pump, 5 hp single phase. To see how they dredge in Nome, Google Bering Sea Gold on the Discovery Channel.Ĭontact: Dennis Furgerson, Goldview Energy, LLCģ0” x 14’ trommel, 22’ feeding prewash with 8”x8” grizzly,15 hp 3phase.ġ6’ sluice box. But now (at 74) I realize that I won't be able to do the work necessary for the dredging.Īsking $40,000 total for the combined 4 claims. I bought these claims last year when I thought I would dredge them myself. Claims are located on Tide and Submerged Land only, and no inland (dry land) property is included. The fourth claim is East of Nome near Port Safety, approximately 120 acres, extending about a half mile (2640 feet) along the beach and then about a half mile into the ocean. Three of the claims are roughly 20 miles West of Nome, contiguous, approximately 40 acres each, extending about a quarter of a mile (1320 feet) along the beach and then a quarter of a mile into the ocean. These are four (4) tidewater claims which start at the water's edge and extend into the ocean. Bylaws for Traditional Mining Districts.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |